Testing Metrics

Metric is a measurement of unit for calculating the Quality of project, process..etc
Metric is calculated using the formula

Below are few of the metrics

Test Coverage = Number of units (KLOC/FP) tested / total size of the system. (LOC represents Lines of Code)

Number of tests per unit size = Number of test cases per KLOC/FP (LOC represents Lines of Code).

Acceptance criteria tested = Acceptance criteria tested / total acceptance criteria

Defects per size = Defects detected / system size

Test cost (in %) = Cost of testing / total cost *100

Cost to locate defect = Cost of testing / the number of defects located

Achieving Budget = Actual cost of testing / Budgeted cost of testing

Defects detected in testing = Defects detected in testing / total system defects

Defects detected in production = Defects detected in production/system size

Quality of Testing = No of defects found during Testing/(No of defects found during testing + No of acceptance defects found after delivery) *100

Effectiveness of testing to business = Loss due to problems / total resources processed by the system.

System complaints = Number of third party complaints / number of transactions processed

Scale of Ten = Assessment of testing by giving rating in scale of 1 to 10

Source Code Analysis = Number of source code statements changed / total number of tests.

Effort Productivity = Test Planning Productivity = No of Test cases designed / Actual Effort for Design and Documentation

Test Execution Productivity = No of Test cycles executed / Actual Effort for testing